“OPTIMASI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA DAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus: Proyek Pembangunan Gedung Islamic Center Halmahera Tengah): Program Studi Teknik Sipil Fakultas Teknik Universitas Nuku Tidore UNNU”. DINTEK 16, no. 1 (March 1, 2023): 17–31. Accessed October 17, 2025. https://jurnal.ummu.ac.id/index.php/dintek/article/view/1484.